| ब्रांड नाम: | SINBO |
| Model Number: | वीपी-कॉम्प-2025 श्रृंखला |
| एमओक्यू: | 1 |
| मूल्य: | 12 |
| भुगतान की शर्तें: | एल/सी, डी/ए, डी/पी, टी/टी, वेस्टर्न यूनियन |
In a battery energy storage system, the busbar is the highway that carries current between cells, modules, and power electronics. Every milliohm of resistance in that path is wasted energy turned into heat, and heat is the enemy of lithium-ion battery longevity. That's why copper - specifically C11000 ETP at 101% IACS conductivity - is the go-to material. Nothing else comes close at this price point.
The machining challenge with copper busbars isn't cutting the material - copper is relatively soft and machines easily. The challenge is holding flatness across the entire mating surface while drilling precision bolt hole patterns. When you're bolting two busbars together to carry 500A, uneven contact pressure means uneven current distribution, which means hot spots, which means accelerated battery degradation. We hold surface flatness to 0.02mm and bolt hole position to +/-0.01mm. That's what it takes to make the connection reliable.
We machine copper busbar connectors for battery energy storage systems, solar-plus-storage installations, EV charging infrastructure, data center UPS, and telecom backup power. The configurations range from simple flat bars with drilled holes to complex multi-layer laminated assemblies with insulation slots machined between layers. Tin plating is the standard surface treatment for battery applications - it prevents oxidation at the bolted joints and is compatible with the glycol-based coolants that run through adjacent cooling plates. Nickel plating for harsh environments, silver plating for maximum conductivity on critical connections.
Our CNC machining centers are equipped with specialized copper cutting tools and parameters optimized for high-conductivity copper. Standard copper milling creates stringy chips that wrap around the tool and destroy surface finish - we've solved that with specific chip breaker geometries and coolant strategies. The result is clean surfaces, accurate dimensions, and consistent conductivity across every connector we ship.
C11000 ETP Copper: 101% IACS conductivity. Maximum current carrying capacity per unit cross-section. If you need even higher purity, C10200 OFHC at 101.5% IACS is available.
Bolt Hole Precision: +/-0.01mm positional accuracy on bolt patterns. When you stack three busbars together, every hole lines up. No egg-shaped holes, no reaming on assembly.
Surface Flatness: 0.02mm across the full mating surface. Consistent contact pressure across the entire joint area means no hot spots in high-current battery circuits.
Lamination Capable: Multi-layer busbar assemblies with insulation slot channels machined between layers. We cut the individual layers, you or your assembly team laminate with insulation barriers.
Tin Plating Standard: 5-10 micron tin plating prevents oxidation at bolted joints and is rated for 200-300C operating temperature. Compatible with battery coolant systems.
| Specification | Details |
|---|---|
| Product Name | CNC Machined Copper Energy Storage Busbar Connector |
| Material Options | Copper C11000 (ETP), Copper C10200 (OFHC), Copper C10100, Brass for lower-cost applications |
| Conductivity | 101% IACS (C11000), 101.5% IACS (C10200 OFHC) |
| Tolerance | +/-0.01mm (bolt holes, mating surfaces), 0.02mm (surface flatness) |
| Current Rating | Custom per design (typically 100A to 2000A per connector) |
| Surface Treatment | Tin Plating, Nickel Plating, Silver Plating, Passivation |
| Certifications | ISO 9001:2015, IATF 16949, RoHS, CE, REACH |
| Lead Time - Prototype | 3-7 days |
| Lead Time - Production | 7-15 days |
| MOQ | 1 piece (prototype), 100+ (production) |
| Origin | Dongguan, China |
Battery Energy Storage: Residential and commercial BESS connectors, battery module interconnection links, system-level power distribution busbars
Solar Energy Storage: Solar-plus-storage connectors, PV inverter DC busbar links, solar battery combiner box interconnections
EV Charging Infrastructure: DC fast charging station connectors, charging module power links, battery pack interconnection busbars
Data Center Power: UPS system connectors, server rack power distribution links, battery backup system interconnections
Telecom Power: Base station backup battery busbar links, 48V DC power system connectors, rectifier system power distribution
Industrial Power: Industrial UPS connectors, switchgear busbar links, motor drive power distribution connections
Copper-Specific Machining: Specialized cutting tools and parameters for high-conductivity copper. Standard CNC shops treat copper like aluminum and wonder why their chips are a mess and their surfaces are torn. We don't.
Flatness Is Non-Negotiable: Surface flatness to 0.02mm isn't aspirational - it's standard on every busbar connector we produce. Verified with gauge measurement on every order.
Conductivity Testing: Every batch gets conductivity verification. Not just dimensional inspection - actual electrical performance confirmation.
20+ Years in Power Components: Since 2003, machining copper busbars and power distribution components for energy storage, solar, and industrial power systems.
Fast Turnaround: 3-7 days for prototypes. Energy storage project timelines are aggressive, and we know your battery pack assembly line doesn't wait.
One-Stop: DFM review, machining, plating, conductivity testing, insulation fitting coordination, packaging, and documentation.
DFM Review: Free analysis of busbar cross-section, bolt pattern layout, current rating verification, and plating selection. We'll check your cross-section against your target current rating.
Material Selection: C11000 ETP standard. C10200 OFHC for high-reliability systems. Brass option for cost-sensitive designs where conductivity requirements are lower.
Precision Machining: CNC milling and routing for busbar profiles, precision drilling for bolt patterns, CNC bending for angled configurations. Copper-optimized tooling and chip control.
Quality Inspection: CMM dimensional verification, surface flatness measurement, conductivity testing, visual inspection for surface quality.
Surface Treatment: Tin plating standard for battery systems (5-10 micron). Nickel plating for high-temperature environments. Silver plating for maximum conductivity. Plating thickness tested and documented.
Packaging & Delivery: Anti-corrosion packaging, electrical insulation protection, documentation package (CoC, MTC, plating reports), worldwide shipping.
Q: What is your minimum order quantity? A: 1 piece for energy storage development prototypes. Production MOQ is typically 100 pieces with volume pricing at 500+.
Q: What copper grades do you use? A: C11000 ETP (101% IACS) is standard. C10200 OFHC (101.5% IACS) available for high-reliability applications requiring superior conductivity and purity.
Q: Can you achieve specific current ratings? A: Yes. We optimize busbar cross-section dimensions based on your target current, ambient temperature, and allowable temperature rise per IEC standards.
Q: Do you provide tin plating? A: Yes. Tin plating (5-10 micron) is standard for battery energy storage - corrosion protection, solder compatibility, rated to 200-300C.
Q: What is the typical lead time? A: Prototype: 3-7 days. Small batch: 7-15 days. Mass production: 15-25 days depending on complexity, plating, and quantity.
Q: Can you machine laminated busbar assemblies? A: Yes. We machine individual layers with precision insulation slots and coordinate lamination assembly with insulation barrier materials.